Details provided point to 3 accessibility checks for project-shapeshift.net having done over the 220 day time frame beginning on April 23, 2024. Operational in 3 instances throughout checks, project-shapeshift.net's last uptime on April 27, 2024, responded with a code 200. Inspections conducted as of November 30, 2024, reveal that there were no periods of unavailability on project-shapeshift.net. Responses received as of November 30, 2024, confirm that no responses have error statuses. On April 27, 2024, project-shapeshift.net responded in a time of 0.843 seconds, which contrasted with its average response time of 1.128 seconds.